BACK TO ALL PROJECTS

Beltway 8

Beltway 8 Widening

Houston, TX


Harris County Toll Road Authority

October 2017 - April 2020

$176.8 million

BACK TO ALL PROJECTS

Overview

Zachry was awarded two Harris County Toll Road Authority (HCTRA) projects to widen and reconstruct southern portion of Beltway 8 (BW8) tollway facility. Both projects widen the toll road from Southwest Freeway (US-59) to the north side of the Houston Ship Channel. This first project (Contract 338) begins South of Spencer Highway to North of Greenshadow Drive along the Sam Houston Tollway East. The second project (Contract 346) begins North of Greenshadow Drive and continues to Jacinto Port Road.

Scope of work includes concrete paving, bridge construction, drainage improvements, mechanically stabilized earth (MSE) walls, water and sewer relocations, toll booths, high mast lightings and sound walls. These projects are a continuation of the ongoing HCTRA program to widen all of BW8 to at least 3 lanes in both directions.

Construction is anticipated to begin in October 2017.

Project Elements

  • Continually Reinforced Concrete Paving
  • Bridge Replacement and Bridge Widening
  • Mechanically Stabilized Earth Walls
  • Storm Drainage Improvements
  • Storm Water Detention Facilities
  • Tolling Facilities
  • Roadway Illumination
  • Intelligent Traffic Systems (ITS)
  • Sound Walls
  • Water and Sewer Utilities