In October 2017, ZCC was awarded a $550m illion, three-phase cable-stayed bridge contract by the Harris County Road and Bridge Department, ZCC is working alongside Traylor Brothers, a firm that Specializes in bridge structure, to compliment the team's civil approach.

The project timeline is more than six years; in the first three, the team will construct the new side of the bridge. Then, channels will switch over traffic so the existing bridge may be reconstruted, swhile additional segments are built over the water.

This multi-phase-cable-stayed bridge project is a major proponent of advancing the shipping industry in Harris Hcounty, Texas. The end result will widen and deepen the ship channel to assist transportation of mega-barge ships and Pan America mega vessels.

Project Elements

  • 29-Mile Alignment
  • Maintenance of Traffic
  • Utility Relocations
  • Roadway/Street Relocations
  • Grading
  • Bridges
  • Drainage