I-85 Widening

I-85 Widening

Spartanburg & Cherokee Counties, SC


South Carolina Department of Transportation

November 2016 - May 2021

$435 million

BACK TO ALL PROJECTS

Overview

South Carolina Department of Transportation awarded a design-build contract to Blythe-Zachry JV, a joint venture of Blythe Construction Inc. and Zachry Construction Corporation.  The purpose of the project is to improve operational efficiency, to accommodate future traffic volumes, correct geometric deficiencies, and to improve existing pavement along the Interstate 85 (I85) corridor.  The project also includes replacement of the CSXT railroad bridge and correcting geometric deficiencies at several interchanges and overpasses as part of the overall reconstruction and widening of I85 from mile marker (MM) 77 to approximate MM98.

The project is currently in design, with construction to begin in summer 2017. The 21-mile project consists of constructing new Portland cement concrete pavement (PCCP) median travel lanes and reconstruction of existing lanes. Crews will place approximately 500,000 cubic yards of new Portland cement concrete pavement (PCCP) in both widening and reconstruction areas. The project also involves the replacement and/or construction of 8-total bridges; over 90,000 linear feet of concrete median barrier; and the construction of various retaining walls.

Project Elements

  • Highway Construction
  • Bridge Construction
  • Railroad Bridge Replacement
  • Interchange Construction