BACK TO ALL PROJECTS

U.S. 281 Premont

U.S. 77 Driscoll Bypass

U.S. 281 Premont

Premont, TX


Texas Department of Transportation

April 2020 - June 2023

$78.4 million

BACK TO ALL PROJECTS

Overview

Zachry Construction Corporation secured a $78 million contract with the Texas Department of Transportation to upgrade U.S. Route 281 to improve the 5.4 miles of highway north and south of Premont, TX, and redirect U.S. 281 to circumvent the town. The work, which just started in April, consists of building 10 bridges, four 12-foot-wide main lanes, and 10-foot-wide outside shoulders. The project also includes the construction of a new wastewater Lift Station to replace the existing Lift Station which is located in conflict with the new alignment. This project will cause minimal disruption to the homes and businesses of Premont, but will serve to relieve traffic congestion in the town, provide safer travel, and promote economic development in the area during construction.

 

 

Project Elements

  • 5.4 miles of highway
  • 10 bridges
  • 12-foot wide main lanes
  • 10-foot wide outside shoulders