Proven Performance. Built to Last.
From sitework for industrial facilities to transportation infrastructure, our construction projects reflect the deep expertise and proven performance you can count on when you work with Zachry Construction. View our portfolio to see the work we’ve successfully delivered for our customers and what we can do for your projects.
-

CLT RAMP SECONDARY PCC
Charlotte Douglas International Airport established a Secondary PCC Slab Replacement Program. This program will include the rehabilitation and replacement of various airfield Portland Cement Concrete…
-

HCTRA: SAM HOUSTON TOLLWAY/HWY 225 INTERSTATE
Construction of four (4) direct connector ramps from the Sam Houston Tollway East to State Highway 225. Widening of mainlanes and frontage roads for State Highway 225.
-

CITY OF FRISCO: PANTHER CREEK PARKWAY
Panther Creek Parkway is new EB/WB roadway construction project that connects the Dallas North Parkway and Preston Road. It includes the excavation/embankment and subgrade, drainage, fiber and…
-

US 70 BUD/ IH 95 INTERCHANGE
This project in Smithfield, North Carolina will see us widening the bridge that takes US 70 over Interstate 95, as well as updating the ramps. We will also be installing a box culvert and adding a…
-

TXDOT SH 71 AT ROSS ROAD & KELLAM ROAD
New interchange consisting of 4 Lane overpasses at Ross and Kellam Rd With 2 Lane EB & WB frontage Roads
-

TXDOT FM 723 – FM 1093 BRAZOS RIVER
FM 723 is a roadway widening project consisting of a current configuration of one lane each direction, which when complete will be two lanes each direction in concrete paving. The project consists of…
-

REHOBETH BRIDGE OVER US29
This is a two-phased demo and replacement of the existing structure over US 29 in Greensboro, NC. Each phase consists of bridge demo and replacement, MSE, shoring, and wire walls, storm drain,…
-

CITY OF IRVING – CONFLANS ROAD EXTENSION
This project will focus on constructing a bridge over Bear Creek spanning a distance of 1,607 feet, along with an accompanying roadway extending for 3,043 feet and water and wastewater infrastructure…
-

CITY OF MESQUITE – LUCAS BLVD RECONSTRUCTION
Faithon P. Lucas Blvd. Paving and Drainage Reconstruction for The City of Mesquite: The FP Lucas Blvd project is the reconstruction of an existing 1.59 mile, 2 lane farm road, to a 4 lane roadway…

