Zachry Underground and Utility Services (ZUUS) completed excavation, earthwork, and utility installation for a new reclaimed water line. The project included approximately 160 linear feet of 12-inch water line and 140 linear feet of 24-inch tunneling beneath FM 1518 to accommodate the utility crossing. ZUUS also installed an air release valve within a concrete vault as part of the new water infrastructure.