Proven Performance. Built to Last.
From sitework for industrial facilities to transportation infrastructure, our construction projects reflect the deep expertise and proven performance you can count on when you work with Zachry Construction. View our portfolio to see the work we’ve successfully delivered for our customers and what we can do for your projects.
-

US 29/US 74 BRIDGE REPLACEMENT OVER CATAWBA RIVER
The North Carolina Department of Transportation selected Zachry Construction Corporation as the prime contractor for the U.S. 29/U.S. 74 bridge replacement over the Catawba River and the associated N.C. 7/U.S. 74 improvements in Gaston and Mecklenburg counties. The $78 million project will strengthen a critical transportation connection between Gaston and Mecklenburg counties while improving capacity, mobility and multimodal connectivity along Wilkinson Boulevard/U.S. 29-74. The corridor also serves as an important regional alternate route when emergencies divert traffic from Interstate 85. The project replaces the existing Catawba River crossing with a new 11-span, 1,145-foot-long bridge with six 12-foot-wide travel lanes and…
-

HOUSTON SHIP CHANNEL BRIDGE EXPANSION
Ship Channel Constructors LLC (SCC), a joint venture between Zachry Construction Corporation and Traylor Bros., Inc., is constructing twin landmark cable-stayed bridges across the Houston Ship Channel while maintaining traffic on one of the region’s busiest roadways and waterways. The new bridges are designed to remove bridge foundations from the channel, supporting future widening and deepening of the waterway to accommodate larger vessels and strengthen the long-term capacity of the Port of Houston and the region’s maritime industry. Construction is being completed in phases, beginning with the new southbound bridge adjacent to the existing structure. The main span incorporates composite…
-

SAVAGE ROUGH GRADING PACKAGE
As a subcontractor to McCord Development, Zachry delivered the Rough Grading Package for the Generation Park East development in Houston, Texas. The project encompassed a comprehensive scope of site preparation and earthwork activities to support future vertical and infrastructure development. Work included implementing stormwater pollution prevention measures, removing the existing wastewater treatment plant (WWTP) main and associated foundations, excavating on-site swales and constructing a sedimentation basin, importing and placing engineered fill materials, and installing storm sewer infrastructure. Zachry’s scope also included mass grading operations to establish design grades and ensure proper drainage across the site. Project quantities include: Fill placement…
-

TXDOT IH35 WIDENING AT RED RIVER BRIDGE
This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements, more than 500,000 square feet of various types of retaining walls, and adding additional lanes with a complete rebuild extending one mile into Oklahoma. There is also installation of a 500 ft. work Trestle spanning the Red River for Bridge Construction.
-

TXDOT I-410 & I-35 INTERCHANGE NEX SOUTH
The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…
-

FM 1518 RECLAIM WATER RELOCATION
Zachry Underground and Utility Services (ZUUS) completed excavation, earthwork, and utility installation for a new reclaimed water line. The project included approximately 160 linear feet of 12-inch water line and 140 linear feet of 24-inch tunneling beneath FM 1518 to accommodate the utility crossing. ZUUS also installed an air release valve within a concrete vault as part of the new water infrastructure.
-

TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER
Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.
-

IH30 FROM LINKCREST DR. TO IH820
Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.
-

HAYWOOD COUNTY BRIDGES – DIVISION 14
The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

