Zachry Construction completed the reconstruction of the SH 225 and Jacinto-Port overpasses and roadway approaches along the Sam Houston Tollway East for the Harris County Toll Road Authority (HCTRA). The project involved replacing existing bridge structures and reconstructing roadway approaches to improve traffic flow, safety and long-term performance along this heavily traveled transportation corridor.
Major construction activities included installation of more than 454,000 square feet of bridge deck and approximately 89,000 square yards of continuously reinforced concrete pavement (CRCP). Supporting improvements included extensive grading and embankment operations, retaining walls, lime-treated subgrade, storm drainage systems, roadway illumination and signage. The project also incorporated new tolling infrastructure and communications and traffic management systems (CTMS).
Construction required coordination of multiple bridge and roadway operations along an active tollway corridor, integrating structural improvements, pavement reconstruction and supporting infrastructure. The completed improvements modernized critical connections along the Sam Houston Tollway East, supporting safer, more efficient travel and the region’s long-term mobility needs.









