FM 723 is a roadway widening project consisting of a current configuration of one lane each direction, which when complete will be two lanes each direction in concrete paving. The project consists of concrete paving, drainage, and bridge work.
FORT BEND COUNTY, TX
TEXAS DEPARTMENT OF TRANSPORTATION
Current
$144 MILLION
FM 723 is a roadway widening project consisting of a current configuration of one lane each direction, which when complete will be two lanes each direction in concrete paving. The project consists of concrete paving, drainage, and bridge work.

The North Carolina Department of Transportation selected Zachry Construction Corporation as the prime contractor for the U.S. 29/U.S. 74 bridge replacement over the Catawba River and the associated N.C. 7/U.S. 74 improvements in Gaston and Mecklenburg counties. The $78 million project will strengthen a critical transportation connection between Gaston and Mecklenburg counties while improving capacity, mobility and multimodal connectivity along Wilkinson Boulevard/U.S. 29-74. The corridor also serves as an important regional alternate route when emergencies divert traffic from Interstate 85. The project replaces the existing Catawba River crossing with a new 11-span, 1,145-foot-long bridge with six 12-foot-wide travel lanes and…

Ship Channel Constructors LLC (SCC), a joint venture between Zachry Construction Corporation and Traylor Bros., Inc., is constructing twin landmark cable-stayed bridges across the Houston Ship Channel while maintaining traffic on one of the region’s busiest roadways and waterways. The new bridges are designed to remove bridge foundations from the channel, supporting future widening and deepening of the waterway to accommodate larger vessels and strengthen the long-term capacity of the Port of Houston and the region’s maritime industry. Construction is being completed in phases, beginning with the new southbound bridge adjacent to the existing structure. The main span incorporates composite…

This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements, more than 500,000 square feet of various types of retaining walls, and adding additional lanes with a complete rebuild extending one mile into Oklahoma. There is also installation of a 500 ft. work Trestle spanning the Red River for Bridge Construction.

The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…

Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…

The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…