PORT SAN ANTONIO TAXIWAY M

Market:

HEAVY + HIGHWAY

Where:

SAN ANTONIO, TX

Client:

PORT SAN ANTONIO

Status:

CURRENT

Contract Amount:

17.5 MILLION

Overview

The Port San Antonio Consolidated Facility Package 3: Taxiway M project includes construction of new airfield pavement and supporting infrastructure at Port San Antonio. Zachry’s scope includes excavation and soil preparation, followed by lime treatment, cement-treated base, concrete paving, and asphalt paving.

The project also includes site drainage, utilities, and flatwork to support the new taxiway infrastructure. The combination of pavement, utility, and drainage improvements requires careful coordination across multiple scopes to deliver a complete and durable airfield facility. Together, these improvements will provide the infrastructure needed to support continued development and operations at Port San Antonio.

Related Projects

  • Heavy + Highway
    Central/South Texas

    TXDOT I-410 & I-35 INTERCHANGE NEX SOUTH

    The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…

    Read More

  • Heavy + Highway
    Central/South Texas

    TXDOT SH 71 AT ROSS ROAD & KELLAM ROAD

    New interchange consisting of 4 Lane overpasses at Ross and Kellam Rd With 2 Lane EB & WB frontage Roads

    Read More

  • Heavy + Highway
    Central/South Texas

    TXDOT AVIATION SAN MARCOS REGIONAL AIRPORT TAXIWAY

    Zachry Construction was awarded the San Marcos Regional Airport Taxiway Improvement Project which includes a rehabilitation of Taxiways C, A, E & F requiring enhancements to the concrete and asphalt…

    Read More

  • Heavy + Highway
    Central/South Texas

    FORT HOOD GEORGETOWN BRIDGE REPLACEMENT

    Zachry Federal Construction Corporation was awarded a design-build project at Fort Hood with JSR Contractors for the United States Army Corps of Engineers to replace Georgetown Road Bridge at…

    Read More

  • Heavy + Highway
    Central/South Texas

    USACE BORDER PATROL STATION/CHECKPOINT

    The project consisted of constructing a new Border Patrol Station Checkpoint in Falfurrias, TX with continued operation of the existing one. Scope of the project included eight primary inspection…

    Read More

  • Heavy + Highway
    Central/South Texas

    US 90A BRIDGE REPLACEMENT

    In July 2020, Zachry Construction Corporation began work on a 15-month bridge replacement project in Eagle Lake, TX where U.S. Highway 90A meets the Colorado River. The work will involve building a…

    Read More

  • Civil Sitework, Heavy + Highway
    Central/South Texas

    US 77 DRISCOLL BYPASS

    Awarded by the Texas Department of Transportation (TxDOT) in July 2018, Zachry Construction Corporation (ZCC) began work on the Driscoll Bypass U.S. 77 project in Feb. 2019. After nearly ten years,…

    Read More

  • Heavy + Highway
    Central/South Texas

    US 75 GRAYSON COUNTY

    On Wednesday, Dec. 4, 2019, Texas Department of Transportation (TxDOT) held a groundbreaking ceremony for the Grayson County U.S. Highway 75 Widening Project located North of Dallas. The…

    Read More

  • Heavy + Highway
    Central/South Texas

    US 281 STONE OAK TO COMAL COUNTY LINE

    Zachry Construction Corporation was awarded Phase 2 of the U.S. 281 project in San Antonio, Texas from the Texas Department of Transportation (TxDOT). The $178.3 million project is a non-tolled…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy