ROOSEVELT MEMORIAL BRIDGE

Market:

HEAVY + HIGHWAY

Where:

LAKE TEXOMA, OK

Client:

OKLAHOMA DEPARTMENT OF TRANSPORTATION

Status:

CURRENT

Contract Amount:

$408.4 MILLION

Overview

The Roosevelt Memorial Bridge Replacement is a $408.4 million project that will provide a new crossing for U.S. 70 over Lake Texoma, strengthening a critical transportation connection between Bryan and Marshall counties and the broader southern Oklahoma and northern Texas region. Zachry Construction and Traylor Bros. are leading the design-build team for the project, which marks the first Modified Progressive Design-Build project in Oklahoma history.

Built just south of the existing bridge, the new Roosevelt Memorial Bridge will feature four travel lanes, wider shoulders, and a 10-foot multi-use path for pedestrians and cyclists. Improvements also include widening the U.S. 70 approaches to two lanes in each direction with a shared center turn lane. Once the new crossing is complete, the existing bridge, which opened in 1945 and carries more than 12,000 vehicles each day, will be removed.

Constructing the bridge across Lake Texoma presents significant technical and logistical challenges, including foundation work in water approximately 65 feet deep near the bridge. Early geotechnical investigations are helping the team evaluate subsurface conditions and inform the design of foundations that will support the new structure. The Modified Progressive Design-Build approach brings the construction team into the design process early, allowing constructability, risk, cost, and schedule considerations to be addressed before work advances in the field.

When complete, the new crossing will provide increased capacity, improved safety, and a more reliable connection for freight, commuters, residents, and visitors traveling through the Lake Texoma region.

Related Projects

  • Heavy + Highway
    North Texas

    TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements, more than 500,000 square feet of various types of retaining walls, and adding additional lanes with a complete rebuild extending one mile into Oklahoma. There is also installation of a 500 ft. work Trestle spanning the Red River for Bridge Construction.

    Read More

  • Heavy + Highway
    North Texas

    IH20 FROM FM1187 TO FM3325

    Reconstruction of the frontage roads upgrading to concrete paving, lowering IH 20 at FM 1187 and lowering IH 30 at Walsh Ranch Parkway to allow for a 18’6” clearance.

    Read More

  • Heavy + Highway
    North Texas

    IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

  • Heavy + Highway
    North Texas

    CITY OF FRISCO: PANTHER CREEK PARKWAY

    Panther Creek Parkway is new EB/WB roadway construction project that connects the Dallas North Parkway and Preston Road. It includes the excavation/embankment and subgrade, drainage, fiber and…

    Read More

  • Heavy + Highway
    North Texas

    CITY OF IRVING – CONFLANS ROAD EXTENSION

    This project will focus on constructing a bridge over Bear Creek spanning a distance of 1,607 feet, along with an accompanying roadway extending for 3,043 feet and water and wastewater infrastructure…

    Read More

  • Heavy + Highway
    North Texas

    CITY OF MESQUITE – LUCAS BLVD RECONSTRUCTION

    Faithon P. Lucas Blvd. Paving and Drainage Reconstruction for The City of Mesquite: The FP Lucas Blvd project is the reconstruction of an existing 1.59 mile, 2 lane farm road, to a 4 lane roadway…

    Read More

  • Civil Sitework, Heavy + Highway
    North Texas

    I-20 RANGER HILL ROAD

    Zachry was awarded the Eastland County Interstate Highway 20 (Ranger Road) project fromt the Texas Department of Transportation to realign existing roadway including grading, pavement, drainage,…

    Read More

  • Heavy + Highway
    North Texas

    DFW AIRPORT NE END AROUND TAXIWAY PACKAGE

    Construct new taxiways, extend existing taxiways, construct jet blast fence, install storm drain, and upgrade airfield lighting and signals.

    Read More

  • Heavy + Highway
    North Texas

    GRAYSON COUNTY FM 1417 WIDENING FROM U.S. 82 TO SH 56

    Two-lane Farm Road 1417 has become a major bottleneck as Sherman, Texas expands east, most recently with a new high school in the area. ZCC has already been working close by on the U.S. Highway 75…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy