Overview

The project widens five miles of Interstate Highway 10 on the east side of San Antonio, Texas from Graytown Road to the Bexar/Guadalupe County Line at Cibolo Creek. The job is part of Texas Department of Transportation’s  larger effort that includes five separate projects to improve the heavily traveled I-10 corridor between San Antonio and Houston. As the east side grows rapidly, the tens of thousands of drivers who travel this corridor every day will benefit from the upgraded capacity and safety standards, with minimal inconvenience in the meantime.

Work consisted of placing low-profile barriers to protect Zachry Underground & Utility Services, one of the subcontractors, as they installed new utility conduits, converting the old two-way frontage roads to one-way operations, and concrete paving to widen the highway to three lanes in each direction, while keeping I-10 traffic moving.

Related Projects

  • Heavy + Highway
    Southeast

    US 29/US 74 BRIDGE REPLACEMENT OVER CATAWBA RIVER

    The North Carolina Department of Transportation selected Zachry Construction Corporation as the prime contractor for the U.S. 29/U.S. 74 bridge replacement over the Catawba River and the associated N.C. 7/U.S. 74 improvements in Gaston and Mecklenburg counties. The $78 million project will strengthen a critical transportation connection between Gaston and Mecklenburg counties while improving capacity, mobility and multimodal connectivity along Wilkinson Boulevard/U.S. 29-74. The corridor also serves as an important regional alternate route when emergencies divert traffic from Interstate 85. The project replaces the existing Catawba River crossing with a new 11-span, 1,145-foot-long bridge with six 12-foot-wide travel lanes and…

    Read More

  • Heavy + Highway
    Gulf Coast Texas

    HOUSTON SHIP CHANNEL BRIDGE EXPANSION

    Ship Channel Constructors LLC (SCC), a joint venture between Zachry Construction Corporation and Traylor Bros., Inc., is constructing twin landmark cable-stayed bridges across the Houston Ship Channel while maintaining traffic on one of the region’s busiest roadways and waterways. The new bridges are designed to remove bridge foundations from the channel, supporting future widening and deepening of the waterway to accommodate larger vessels and strengthen the long-term capacity of the Port of Houston and the region’s maritime industry. Construction is being completed in phases, beginning with the new southbound bridge adjacent to the existing structure. The main span incorporates composite…

    Read More

  • Heavy + Highway
    North Texas

    TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements, more than 500,000 square feet of various types of retaining walls, and adding additional lanes with a complete rebuild extending one mile into Oklahoma. There is also installation of a 500 ft. work Trestle spanning the Red River for Bridge Construction.

    Read More

  • Heavy + Highway
    Central/South Texas

    TXDOT I-410 & I-35 INTERCHANGE NEX SOUTH

    The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…

    Read More

  • Underground Utilities
    Central/South Texas

    FM 1518 RECLAIM WATER RELOCATION

    Zachry Underground and Utility Services (ZUUS) completed excavation, earthwork, and utility installation for a new reclaimed water line. The project included approximately 160 linear feet of 12-inch water line and 140 linear feet of 24-inch tunneling beneath FM 1518 to accommodate the utility crossing. ZUUS also installed an air release valve within a concrete vault as part of the new water infrastructure.

    Read More

  • Heavy + Highway
    Gulf Coast Texas

    TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER

    Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

    Read More

  • Heavy + Highway
    North Texas

    IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

  • Heavy + Highway
    Southeast

    HAYWOOD COUNTY BRIDGES – DIVISION 14

    The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

    Read More

  • Underground Utilities
    Central/South Texas

    CPS ENERGY – URD CONTRACT

    Underground residential electric distribution and electrical terminations in existing subdivisions and apartments within CPS Energy’s service area. Rehabilitating direct buried cable to cable in…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy