I-85/385 INTERCHANGE IMPROVEMENTS

Where:

GREENVILLE, SC

Client:

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION

Status:

Complete

Contract Amount:

$12 MILLION

Overview

Joint venture team Flatiron-Zachry will design and construct a $231 million design-build project for the South Carolina Department of Transportation (SCDOT) that will reconfigure the interchange at I-85 and I-385, improving traffic operations and safety for about 194,000 vehicles per day. Construction began in late fall 2015 and is scheduled for completion in 2020.

The project will replace existing loop ramps with direct-connect, high-level flyover bridges and includes construction of a new collector-distributor roadway along Interstates 85 and 385. The project also includes reconfiguration and replacement of existing ramps, construction of additional lanes along I-85 and I-385, resurfacing and rehabilitation of I-85. Crews will construct 12 new bridges, rehabilitate two existing bridges and construct mechanically stabilized earth (MSE) retaining walls. The project will also require extensive attention to traffic maintenance to minimize impact on the traveling public.

The new interchange will relieve congestion and increase safety on the third busiest interchange in South Carolina. The project is the state’s largest transportation infrastructure project in over a decade.

Related Projects

  • Heavy + Highway
    Southeast

    US 29/US 74 BRIDGE REPLACEMENT OVER CATAWBA RIVER

    The North Carolina Department of Transportation selected Zachry Construction Corporation as the prime contractor for the U.S. 29/U.S. 74 bridge replacement over the Catawba River and the associated N.C. 7/U.S. 74 improvements in Gaston and Mecklenburg counties. The $78 million project will strengthen a critical transportation connection between Gaston and Mecklenburg counties while improving capacity, mobility and multimodal connectivity along Wilkinson Boulevard/U.S. 29-74. The corridor also serves as an important regional alternate route when emergencies divert traffic from Interstate 85. The project replaces the existing Catawba River crossing with a new 11-span, 1,145-foot-long bridge with six 12-foot-wide travel lanes and…

    Read More

  • Heavy + Highway
    Gulf Coast Texas

    HOUSTON SHIP CHANNEL BRIDGE EXPANSION

    Ship Channel Constructors LLC (SCC), a joint venture between Zachry Construction Corporation and Traylor Bros., Inc., is constructing twin landmark cable-stayed bridges across the Houston Ship Channel while maintaining traffic on one of the region’s busiest roadways and waterways. The new bridges are designed to remove bridge foundations from the channel, supporting future widening and deepening of the waterway to accommodate larger vessels and strengthen the long-term capacity of the Port of Houston and the region’s maritime industry. Construction is being completed in phases, beginning with the new southbound bridge adjacent to the existing structure. The main span incorporates composite…

    Read More

  • Heavy + Highway
    North Texas

    TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements, more than 500,000 square feet of various types of retaining walls, and adding additional lanes with a complete rebuild extending one mile into Oklahoma. There is also installation of a 500 ft. work Trestle spanning the Red River for Bridge Construction.

    Read More

  • Heavy + Highway
    Central/South Texas

    TXDOT I-410 & I-35 INTERCHANGE NEX SOUTH

    The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…

    Read More

  • Heavy + Highway
    Gulf Coast Texas

    TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER

    Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

    Read More

  • Heavy + Highway
    North Texas

    IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

  • Heavy + Highway
    Southeast

    HAYWOOD COUNTY BRIDGES – DIVISION 14

    The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

    Read More

  • Heavy + Highway
    Southeast

    TYNDALL AFB – ZONE 1 CONCRETE PAVING

    The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…

    Read More

  • Heavy + Highway
    Southeast

    CLT W RAMP DUAL TAXI LANE WIDENING

    The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy