Proven Performance. Built to Last.
From sitework for industrial facilities to transportation infrastructure, our construction projects reflect the deep expertise and proven performance you can count on when you work with Zachry Construction. View our portfolio to see the work we’ve successfully delivered for our customers and what we can do for your projects.
-

CPS ENERGY – URD CONTRACT
Underground residential electric distribution and electrical terminations in existing subdivisions and apartments within CPS Energy’s service area. Rehabilitating direct buried cable to cable in…
-

CCMA SCHERTZ 48 IN. GRAVITY SEWER LINE
The project consists of the construction of a new Sewer Lift Station including abandonment and removal of the existing Sewer Lift Station located in Schertz, TX. The work includes the installation of…
-

TYNDALL AFB – ZONE 1 CONCRETE PAVING
The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…
-

CLT W RAMP DUAL TAXI LANE WIDENING
The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…
-

CLT RAMP SECONDARY PCC
Charlotte Douglas International Airport established a Secondary PCC Slab Replacement Program. This program will include the rehabilitation and replacement of various airfield Portland Cement Concrete…
-

HCTRA: SAM HOUSTON TOLLWAY/HWY 225 INTERSTATE
Construction of four (4) direct connector ramps from the Sam Houston Tollway East to State Highway 225. Widening of mainlanes and frontage roads for State Highway 225.
-

CITY OF FRISCO: PANTHER CREEK PARKWAY
Panther Creek Parkway is new EB/WB roadway construction project that connects the Dallas North Parkway and Preston Road. It includes the excavation/embankment and subgrade, drainage, fiber and…
-

CITY OF CORPUS CHRISTI: WESLEY SEALE DAM
The project consists of the replacement of two aging spillway crest gates, and retrofitting 25 additional bays on the dam with the installation of a new dewatering system using new stop logs. A new…
-

WHITE OAK BAYOU SEGMENT 105
Segment 105 runs 7.8 miles along White Oak Bayou from 1960 to Hollister Rd. and is comprised of replacing drainage, reshaping, and protecting slopes from erosion by rock and concrete placement, and…