GREENVILLE-SPARTANBURG TAXIWAYS L5 AND L6

Where:

GREER, SC

Client:

GREENVILLE-SPARTANBURG INTERNATIONAL AIRPORT (ROGER MILLIKEN FIELD)

Status:

Complete

Contract Amount:

$1.25 MILLION

Overview

Concrete taxiway connectors at Greenville-Spartanburg International Airport in Greer, SC. Zachry Construction is a concrete paving subcontractor to Rogers Group.

Related Projects

  • Heavy + Highway
    Central/South Texas

    LOOP 1604 FROM IH-10 TO US 281

    The Loop 1604 Expansion Project is improving mobility, capacity, and safety along one of San Antonio’s heavily traveled corridors. Zachry, in a 50/50 joint venture with Austin Bridge & Road as North Loop Constructors, is delivering improvements along Loop 1604 from IH-10 to US 281. The project expands Loop 1604 from a four-lane expressway to a ten-lane facility, including new eastbound and westbound mainlanes, improvements to existing pavement, and portions of the planned IH-10 direct connectors. Additional work includes reconfigured auxiliary lanes, entrance and exit ramps, and widened mainlane and frontage road bridges. A major component of the project comes…

    Read More

  • Heavy + Highway
    Central/South Texas

    PORT SAN ANTONIO TAXIWAY M

    The Port San Antonio Consolidated Facility Package 3: Taxiway M project includes construction of new airfield pavement and supporting infrastructure at Port San Antonio. Zachry’s scope includes excavation and soil preparation, followed by lime treatment, cement-treated base, concrete paving, and asphalt paving. The project also includes site drainage, utilities, and flatwork to support the new taxiway infrastructure. The combination of pavement, utility, and drainage improvements requires careful coordination across multiple scopes to deliver a complete and durable airfield facility. Together, these improvements will provide the infrastructure needed to support continued development and operations at Port San Antonio.

    Read More

  • Heavy + Highway
    Southeast

    US 29/US 74 BRIDGE REPLACEMENT OVER CATAWBA RIVER

    The North Carolina Department of Transportation selected Zachry Construction Corporation as the prime contractor for the U.S. 29/U.S. 74 bridge replacement over the Catawba River and the associated N.C. 7/U.S. 74 improvements in Gaston and Mecklenburg counties. The $78 million project will strengthen a critical transportation connection between Gaston and Mecklenburg counties while improving capacity, mobility and multimodal connectivity along Wilkinson Boulevard/U.S. 29-74. The corridor also serves as an important regional alternate route when emergencies divert traffic from Interstate 85. The project replaces the existing Catawba River crossing with a new 11-span, 1,145-foot-long bridge with six 12-foot-wide travel lanes and…

    Read More

  • Heavy + Highway
    Gulf Coast Texas

    HOUSTON SHIP CHANNEL BRIDGE EXPANSION

    Ship Channel Constructors LLC (SCC), a joint venture between Zachry Construction Corporation and Traylor Bros., Inc., is constructing twin landmark cable-stayed bridges across the Houston Ship Channel while maintaining traffic on one of the region’s busiest roadways and waterways. The new bridges are designed to remove bridge foundations from the channel, supporting future widening and deepening of the waterway to accommodate larger vessels and strengthen the long-term capacity of the Port of Houston and the region’s maritime industry. Construction is being completed in phases, beginning with the new southbound bridge adjacent to the existing structure. The main span incorporates composite…

    Read More

  • Heavy + Highway
    North Texas

    TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements, more than 500,000 square feet of various types of retaining walls, and adding additional lanes with a complete rebuild extending one mile into Oklahoma. There is also installation of a 500 ft. work Trestle spanning the Red River for Bridge Construction.

    Read More

  • Heavy + Highway
    Central/South Texas

    TXDOT I-410 & I-35 INTERCHANGE NEX SOUTH

    The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…

    Read More

  • Heavy + Highway
    North Texas

    IH20 FROM FM1187 TO FM3325

    Reconstruction of the frontage roads upgrading to concrete paving, lowering IH 20 at FM 1187 and lowering IH 30 at Walsh Ranch Parkway to allow for a 18’6” clearance.

    Read More

  • Heavy + Highway
    Gulf Coast Texas

    TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER

    Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

    Read More

  • Heavy + Highway
    North Texas

    IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy