SAN ANTONIO RIVER IMPROVEMENTS – MUSEUM REACH

Where:

SAN ANTONIO, TX

Client:

MUSEUM REACH

Status:

Complete

Contract Amount:

CONFIDENTIAL

Overview

This three-phase segment doubled the length of the existing River Walk and extends the distinctive San Antonio experience to an undeveloped section of the river north of downtown. Construction of this segment stabilized the river channel and extended navigation by river barge through the addition of a lock and dam.

Zachry provided major excavation services, concrete work, bulkhead erection, retaining walls, and a lock and dam system on an active river. This required careful water management through wellpoint dewatering, surface unwatering, river flow surface diversion, river flow bypass pumping diversion and cofferdams.

The architectural scope included public restrooms, a street to the river barge unloading/loading facility, visitor overlook facilities at numerous locations, and complete lighting and signage systems.

Upon the discovery of historic rock dam remains, the Museum Reach project called for an extensive redesign — without impacting the overall schedule and budget.

The San Antonio River Authority (SARA) was in charge of the overall management of the San Antonio River Improvements Project (SARIP). The development and coordination of SARIP was the result of cooperation among the City of San Antonio, Bexar County, SARA, the USACE, the San Antonio River Oversight Committee and the San Antonio River Foundation. SARIP represented the best of inter-governmental and public–private ownership.

Related Projects

  • Water Infrastructure
    Gulf Coast Texas

    LANE CITY DAM REHABILITATION

    The Lane City Dam Hurricane Harvey Rehabilitation and Recovery Project is restoring and strengthening the dam and its surrounding banks to improve long-term resilience following damage caused by Hurricane Harvey. Zachry’s work includes installing new sheet piling and grout bags along the west bank and existing dam, modifying and extending sheet piling on the east bank, and stabilizing eroded slopes with excavation, rock riprap, and other protective measures. The project also includes replacement of the gate hydraulic cylinder and construction of a new control building with upgraded electrical systems. To support construction across the site, Zachry constructed a temporary trestle…

    Read More

  • Water Infrastructure
    Central/South Texas

    PALMETTO BEND DAM REMEDIATION

    Zachry is rehabilitating Palmetto Bend Dam for the Lavaca-Navidad River Authority in Jackson County, Texas. The project is designed to enhance embankment stability and long-term dam safety by reducing downstream water pressure and mitigating conditions that could contribute to seepage and piping. The centerpiece of the rehabilitation is approximately 1,550 linear feet of permanent cutoff wall constructed along the dam crest, including an additional test section used to evaluate performance and determine whether further extension is needed. Zachry’s work also includes improvements within the East Drain Ditch, where the team will construct a boil closure to replace the existing sand…

    Read More

  • Civil Sitework
    Gulf Coast Texas

    SAVAGE ROUGH GRADING PACKAGE

    As a subcontractor to McCord Development, Zachry delivered the Rough Grading Package for the Generation Park East development in Houston, Texas. The project encompassed a comprehensive scope of site preparation and earthwork activities to support future vertical and infrastructure development. Work included implementing stormwater pollution prevention measures, removing the existing wastewater treatment plant (WWTP) main and associated foundations, excavating on-site swales and constructing a sedimentation basin, importing and placing engineered fill materials, and installing storm sewer infrastructure. Zachry’s scope also included mass grading operations to establish design grades and ensure proper drainage across the site. Project quantities include: Fill placement…

    Read More

  • Water Infrastructure
    Central/South Texas

    CITY OF CORPUS CHRISTI: WESLEY SEALE DAM

    The project consists of the replacement of two aging spillway crest gates, and retrofitting 25 additional bays on the dam with the installation of a new dewatering system using new stop logs. A new…

    Read More

  • Water Infrastructure
    Gulf Coast Texas

    WHITE OAK BAYOU SEGMENT 105

    Segment 105 runs 7.8 miles along White Oak Bayou from 1960 to Hollister Rd. and is comprised of replacing drainage, reshaping, and protecting slopes from erosion by rock and concrete placement, and…

    Read More

  • Civil Sitework, Heavy + Highway
    North Texas

    I-20 RANGER HILL ROAD

    Zachry was awarded the Eastland County Interstate Highway 20 (Ranger Road) project fromt the Texas Department of Transportation to realign existing roadway including grading, pavement, drainage,…

    Read More

  • Civil Sitework
    Central/South Texas

    FORT HOOD MOTOR POOL REPAIR

    Zachry Federal Construction Corporation was award a design-build project at Fort Hood with JSR for the United States Army Corps of Engineers. The Fort Hood Motor Pool Repair Project consisted of…

    Read More

  • Civil Sitework
    North Texas

    TXDOT PARKING LOT

    On April, 3 2020, Zachry Construction Corporation completed the Texas Department of Transportation’s (TxDOT) new parking lot for the Fort Worth district headquarters. The completetion came a month…

    Read More

  • Water Infrastructure
    Central/South Texas

    WALLER CREEK TUNNEL PROJECT

    The Waller Creek corridor in downtown Austin is part of a 100-year floodplain and, by the project’s start date in July 2012, was in need of a comprehensive flood relief plan. The City of Austin…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy