CITY OF CORPUS CHRISTI: WESLEY SEALE DAM

Where:

CORPUS CHRISTI, TX

Client:

CITY OF CORPUS CHRISTI

Status:

Current

Contract Amount:

$25 MILLION

Overview

The project consists of the replacement of two aging spillway crest gates, and retrofitting 25 additional bays on the dam with the installation of a new dewatering system using new stop logs.  A new gantry crane will also be added that will help in moving the stop logs to any section of the dam.

Related Projects

  • Water Infrastructure
    Gulf Coast Texas

    WHITE OAK BAYOU SEGMENT 105

    Segment 105 runs 7.8 miles along White Oak Bayou from 1960 to Hollister Rd. and is comprised of replacing drainage, reshaping, and protecting slopes from erosion by rock and concrete placement, and…

    Read More

  • Water Infrastructure
    Central/South Texas

    WALLER CREEK TUNNEL PROJECT

    The Waller Creek corridor in downtown Austin is part of a 100-year floodplain and, by the project’s start date in July 2012, was in need of a comprehensive flood relief plan. The City of Austin…

    Read More

  • Water Infrastructure
    Central/South Texas

    SAN ANTONIO RIVER IMPROVEMENTS – MISSION REACH

    With the completion of the Mission Reach Ecosystem Restoration and Recreation Project in October 2014, the San Antonio River Authority gained a new piece of history adding to San Antonio’s storied…

    Read More

  • Water Infrastructure
    Central/South Texas

    GBRA LAKE DUNLAP

    The project will rebuild and replace all three 93-year-old spill gates on Lake Dunlap Dam. This dam is located on the Guadalupe River between Seguin and New Braunfels, TX in Guadalupe County. In May…

    Read More

  • Water Infrastructure
    Central/South Texas

    SAWS BRACKISH GROUNDWATER DESALINATION PROJECT – PHASE I

    The San Antonio Water System (SAWS) desalination project, a Zachry-led joint venture, transforms brackish water into millions of gallons of drinkable water. SAWS and the City of San Antonio (CoSA)…

    Read More

  • Civil Sitework, Water Infrastructure
    Central/South Texas

    SAN ANTONIO RIVER IMPROVEMENTS – MUSEUM REACH

    This three-phase segment doubled the length of the existing River Walk and extends the distinctive San Antonio experience to an undeveloped section of the river north of downtown. Construction of…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy