PALMETTO BEND DAM REMEDIATION

Market:

WATER INFRASTRUCTURE

Where:

EDNA, TX

Client:

LAVACA-NAVIDAD RIVER AUTHORITY

Status:

CURRENT

Contract Amount:

$13.8 MILLION

Overview

Zachry is rehabilitating Palmetto Bend Dam for the Lavaca-Navidad River Authority in Jackson County, Texas. The project is designed to enhance embankment stability and long-term dam safety by reducing downstream water pressure and mitigating conditions that could contribute to seepage and piping.

The centerpiece of the rehabilitation is approximately 1,550 linear feet of permanent cutoff wall constructed along the dam crest, including an additional test section used to evaluate performance and determine whether further extension is needed. Zachry’s work also includes improvements within the East Drain Ditch, where the team will construct a boil closure to replace the existing sand boil and ring dike. This work includes a cofferdam, inverted filter with an internal drainage system, concrete cap, and additional bedding and riprap as required to stabilize ditch conditions.

Following cutoff wall installation, Zachry will manage the required consolidation period before completing roadway repairs and final site restoration. Zachry’s self-performing capabilities in excavation, earthwork, cutoff wall installation, cofferdam construction, and drainage systems provide greater control over safety, quality, schedule, and cost throughout this technically complex dam rehabilitation project.

Related Projects

  • Water Infrastructure
    Central/South Texas

    CITY OF CORPUS CHRISTI: WESLEY SEALE DAM

    The project consists of the replacement of two aging spillway crest gates, and retrofitting 25 additional bays on the dam with the installation of a new dewatering system using new stop logs. A new…

    Read More

  • Water Infrastructure
    Central/South Texas

    WALLER CREEK TUNNEL PROJECT

    The Waller Creek corridor in downtown Austin is part of a 100-year floodplain and, by the project’s start date in July 2012, was in need of a comprehensive flood relief plan. The City of Austin…

    Read More

  • Water Infrastructure
    Central/South Texas

    SAN ANTONIO RIVER IMPROVEMENTS – MISSION REACH

    With the completion of the Mission Reach Ecosystem Restoration and Recreation Project in October 2014, the San Antonio River Authority gained a new piece of history adding to San Antonio’s storied…

    Read More

  • Water Infrastructure
    Central/South Texas

    GBRA LAKE DUNLAP

    The project will rebuild and replace all three 93-year-old spill gates on Lake Dunlap Dam. This dam is located on the Guadalupe River between Seguin and New Braunfels, TX in Guadalupe County. In May…

    Read More

  • Water Infrastructure
    Central/South Texas

    SAWS BRACKISH GROUNDWATER DESALINATION PROJECT – PHASE I

    The San Antonio Water System (SAWS) desalination project, a Zachry-led joint venture, transforms brackish water into millions of gallons of drinkable water. SAWS and the City of San Antonio (CoSA)…

    Read More

  • Civil Sitework, Water Infrastructure
    Central/South Texas

    SAN ANTONIO RIVER IMPROVEMENTS – MUSEUM REACH

    This three-phase segment doubled the length of the existing River Walk and extends the distinctive San Antonio experience to an undeveloped section of the river north of downtown. Construction of…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy