SAWS BRACKISH GROUNDWATER DESALINATION PROJECT – PHASE I

Where:

SAN ANTONIO, TX

Client:

SAN ANTONIO WATER SYSTEM (SAWS)

Status:

Complete

Contract Amount:

$117.9 MILLION

Overview

The San Antonio Water System (SAWS) desalination project, a Zachry-led joint venture, transforms brackish water into millions of gallons of drinkable water. SAWS and the City of San Antonio (CoSA) worked together to find an alternative source of water for San Antonio. The solution was to drill deeper, going up to 1,720 feet for the production supply wells and over 5,000 feet deep for the disposal wells.

This project is Phase I of the solution which included a 60,000-square-foot water treatment plant facility located at the previous SAWS Twin Oaks Aquifer Storage and Recovery site (3,000 acres).  The facility is now called H2Oaks and produces up to 12 million gallons of treated water per day through a reverse osmosis process in which salts and minerals are removed or desalination. The treatment plant involved a complicated process of mechanical, electrical and supervisory control and data acquisition (SCADA) – basically the brains of the plant controls systems; some of this equipment required many months lead times for manufacturing.

The project also included drilling four production wells and one injection well, the fit out of 12 production and two injection well sites, and installing over 12 miles of high density polyethylene (HDPE) – a thick walled piping that is somewhat flexible and “fused” (welded) together at the joints, conveyance pipeline and access roads to the remote well sites.  Zachry also provided start-up, commissioning and acceptance testing.

SAWS now uses H2Oaks as a public tour destination, with bus parking lanes, large observation areas, a conference room and a laboratory for college-level research projects. Phases II and III are expected to produce an additional 12 and 6 MGD, respectively, bringing the total capacity to 30 MGD by 2026 — the largest in Texas and the largest inland desalination plant in the country.

Phases II and III are expected to produce an additional 12 and 6 MGD, respectively, bringing the program’s total capacity to 30 MGD by 2026 — the largest in Texas and the largest inland desalination plant in the country.

Related Projects

  • Water Infrastructure
    Central/South Texas

    CITY OF CORPUS CHRISTI: WESLEY SEALE DAM

    The project consists of the replacement of two aging spillway crest gates, and retrofitting 25 additional bays on the dam with the installation of a new dewatering system using new stop logs. A new…

    Read More

  • Water Infrastructure
    Gulf Coast Texas

    WHITE OAK BAYOU SEGMENT 105

    Segment 105 runs 7.8 miles along White Oak Bayou from 1960 to Hollister Rd. and is comprised of replacing drainage, reshaping, and protecting slopes from erosion by rock and concrete placement, and…

    Read More

  • Water Infrastructure
    Central/South Texas

    WALLER CREEK TUNNEL PROJECT

    The Waller Creek corridor in downtown Austin is part of a 100-year floodplain and, by the project’s start date in July 2012, was in need of a comprehensive flood relief plan. The City of Austin…

    Read More

  • Water Infrastructure
    Central/South Texas

    SAN ANTONIO RIVER IMPROVEMENTS – MISSION REACH

    With the completion of the Mission Reach Ecosystem Restoration and Recreation Project in October 2014, the San Antonio River Authority gained a new piece of history adding to San Antonio’s storied…

    Read More

  • Water Infrastructure
    Central/South Texas

    GBRA LAKE DUNLAP

    The project will rebuild and replace all three 93-year-old spill gates on Lake Dunlap Dam. This dam is located on the Guadalupe River between Seguin and New Braunfels, TX in Guadalupe County. In May…

    Read More

  • Civil Sitework, Water Infrastructure
    Central/South Texas

    SAN ANTONIO RIVER IMPROVEMENTS – MUSEUM REACH

    This three-phase segment doubled the length of the existing River Walk and extends the distinctive San Antonio experience to an undeveloped section of the river north of downtown. Construction of…

    Read More

Together We Can Do Great Things

Great construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy