Proven Performance. Built to Last.
From sitework for industrial facilities to transportation infrastructure, our construction projects reflect the deep expertise and proven performance you can count on when you work with Zachry Construction. View our portfolio to see the work we’ve successfully delivered for our customers and what we can do for your projects.
-

LANE CITY DAM REHABILITATION
The Lane City Dam Hurricane Harvey Rehabilitation and Recovery Project is restoring and strengthening the dam and its surrounding banks to improve long-term resilience following damage caused by Hurricane Harvey. Zachry’s work includes installing new sheet piling and grout bags along the west bank and existing dam, modifying and extending sheet piling on the east bank, and stabilizing eroded slopes with excavation, rock riprap, and other protective measures. The project also includes replacement of the gate hydraulic cylinder and construction of a new control building with upgraded electrical systems. To support construction across the site, Zachry constructed a temporary trestle…
-

PALMETTO BEND DAM REMEDIATION
Zachry is rehabilitating Palmetto Bend Dam for the Lavaca-Navidad River Authority in Jackson County, Texas. The project is designed to enhance embankment stability and long-term dam safety by reducing downstream water pressure and mitigating conditions that could contribute to seepage and piping. The centerpiece of the rehabilitation is approximately 1,550 linear feet of permanent cutoff wall constructed along the dam crest, including an additional test section used to evaluate performance and determine whether further extension is needed. Zachry’s work also includes improvements within the East Drain Ditch, where the team will construct a boil closure to replace the existing sand…
-

CITY OF CORPUS CHRISTI: WESLEY SEALE DAM
The project consists of the replacement of two aging spillway crest gates, and retrofitting 25 additional bays on the dam with the installation of a new dewatering system using new stop logs. A new…
-

WHITE OAK BAYOU SEGMENT 105
Segment 105 runs 7.8 miles along White Oak Bayou from 1960 to Hollister Rd. and is comprised of replacing drainage, reshaping, and protecting slopes from erosion by rock and concrete placement, and…
-
WALLER CREEK TUNNEL PROJECT
The Waller Creek corridor in downtown Austin is part of a 100-year floodplain and, by the project’s start date in July 2012, was in need of a comprehensive flood relief plan. The City of Austin…
-

SAN ANTONIO RIVER IMPROVEMENTS – MISSION REACH
With the completion of the Mission Reach Ecosystem Restoration and Recreation Project in October 2014, the San Antonio River Authority gained a new piece of history adding to San Antonio’s storied…
-

GBRA LAKE DUNLAP
The project will rebuild and replace all three 93-year-old spill gates on Lake Dunlap Dam. This dam is located on the Guadalupe River between Seguin and New Braunfels, TX in Guadalupe County. In May…
-

SAWS BRACKISH GROUNDWATER DESALINATION PROJECT – PHASE I
The San Antonio Water System (SAWS) desalination project, a Zachry-led joint venture, transforms brackish water into millions of gallons of drinkable water. SAWS and the City of San Antonio (CoSA)…
-

SAN ANTONIO RIVER IMPROVEMENTS – MUSEUM REACH
This three-phase segment doubled the length of the existing River Walk and extends the distinctive San Antonio experience to an undeveloped section of the river north of downtown. Construction of…

